Articles on: Schedule Planning

Dragging shifts in the schedule

Dragging with the mouse is the fastest way to make corrections in the schedule: you move a shift to another day or another person, assign an open shift, and in the day view shift the hours and draw new shifts. You do not open the edit window, and the system checks straight away whether the shift can be dropped in a given place.


Remember: Dragging is available to the people who build the schedule in a given location: Manager, Location Manager, Advisor and Organisation Administrator. Dragging works with the mouse. On a touch screen your finger scrolls the schedule.


Moving a shift to another day or another person


This mode works in the "Week", "2 weeks", "4 weeks", "Month" and "Compact month" ranges.


  1. Press the left mouse button on a shift tile and move the cursor. The tile follows the cursor and its place in the grid fades.
  2. Drag it to another day of the same employee, to another employee's cell or to the "Unassigned" row. Near the top and bottom edges the schedule scrolls by itself; you can also use the mouse wheel.
  3. The cell under the cursor is highlighted in blue when the shift can be dropped there. Release the button and the shift changes place immediately.


A shift tile being dragged onto Wednesday of the same employee, the target cell highlighted in blue


Dragging always moves one shift, it does not copy it. From a tile with a counter (several identical shifts in one cell) you move one of them. To copy a shift, use the Copy icon on the tile, described in Creating and managing a shift.


You can always drop a shift into the "Unassigned" row. This takes it off the employee, and you assign it later by hand or through schedule generation.


A shift tile being dragged into the Unassigned row


The Esc key cancels the move while dragging. Dropping the tile outside the schedule cells, or back into the same cell, changes nothing.


Tip: In "Select" mode, dragging over tiles selects shifts with a frame, and in employee order editing mode it rearranges rows. You cannot move shifts by dragging then.


When a shift cannot be dropped


A red cell frame and a crossed-out cursor mean the drop is blocked. After you release the button the tile returns to its place, and the message "Shift cannot be moved here" gives the reason:


  • a conflict with another shift of the employee at those hours,
  • an approved leave or request covering that day or the shift hours (a pending request does not block),
  • the employee lacks the required position,
  • an employee from another location, i.e. not assigned to the row's location,
  • the employee is excluded from the schedule or archived,
  • a locked cell: a day before today or a day after the end of employment (when the location enforces contract dates). The Organisation Administrator and the Advisor can move shifts onto these days too,
  • the shift has a time stamp (a time entry). You correct such a shift by hand, in the edit window.


A tile over a cell with a red frame: a conflict with another shift of the employee


You also cannot drag a shift from a day locked for editing, a shift from another location shown for reference only, or shifts in a location you can only view. Such tiles cannot be grabbed.


What happens after the drop


  • The shift keeps its hours, position, tags, breaks and comments. Only the day and the person change.
  • The system checks the shift with the same working time rules as saving in the shift window. You will see violations in the warnings window. When a rule blocks saving, the shift returns to its place, and the Organisation Administrator and the Advisor can save it with the "Save anyway" button.
  • A published shift moved onto an employee stays published, and the employee gets a schedule change notification (in line with their notification settings). A shift moved to "Unassigned" goes back to draft.
  • The move shows no separate confirmation: the tile simply stands in its new place.


Assigning an open shift by dragging


You can drag a tile from the "Open shifts" row onto an employee's row on the same day and in the same location. A blue highlight means the person can get this shift. A red frame means a block: a day other than the shift's day, an employee outside the location, a conflict with their shift or leave, or a locked cell. After the drop the shift goes to the employee just as with the "Assign person" action. Details are in the article Open shifts in the schedule.


Day view: hours, length and a new shift


In the "Day" range each shift is a bar on the hour axis. Here dragging changes the shift's hours, but not the day or the employee.


  • Shifting the hours: grab the bar and move it left or right. The length of the shift does not change, and the label on the bar shows the new hours.
  • Changing the length: grab the left or right edge of the bar. The label shows the new hours and the difference in length, e.g. +1h 30min.
  • New shift: drag across an employee's empty track from the start hour to the end hour. When you release, the "New shift" window opens with the selected hours. A single click on an empty track opens the window with a one-hour shift.


Day view: a shift bar stretched by its right edge, the label with the new hours and the difference in length


The hours snap every 15 minutes, a shift lasts at least 15 minutes and stays within one day. You cannot move shifts with "Non-standard hours" in the day view; you change their length in the shift window. When the new time collides with another shift or breaks working time rules, you will see a message and the bar returns to its place.


Day view: selecting the hours of a new shift on an employee's empty track


Turning dragging on and off


Dragging is on by default. You turn it off in the "View" menu, in the "Layout" section, with the "Drag and drop shifts" box, or in the "More preferences" window. The setting is saved on your account, so it applies on every computer.


The View menu with the Drag and drop shifts box ticked in the Layout section


Important: The switch applies to moving tiles in the grid of days and to assigning open shifts. You move bars in the "Day" view regardless of this setting.

Updated on: 23/11/2026

Was this article helpful?

Share your feedback

Cancel

Thank you!